Project Info

  • Construction of 4 Stored Commercial Building at Kiwatuule, Ntinda

    The works included civil works i.e earthworks, strucutral concrete (555cm3); structural steel work erection; solid concrete blockwork/ walling; finsihes; pavement and drainage ; structural timber roofing of 3270 LM.

More Project

  • Commercial Laying of Farm Masindi Port

    Commercial Laying of Farm Masindi Port, Rwenkunye : Extra Works Including Fencing of Feed mill and Manager’s House, Building Kitchen, Rearing Ablutions and Generator House

  • Construction of Dungu- Bitima – Nebiapayi Road (140km) Congo

    Sub contracted to widen the road to 10m, regravelling of the road with haulage distance not exceeding 10km. Side drains and all necessary furniture put in place.

  • Masindi Phase 2: Construction of Chain Link Fence, Four Chicken Houses, Ablution, Disinfectant, Mortality Pit, Walkways, Kitchen, Road works and Installation of Power line, Waterline and Tank Stand and Drilling of Borehole.

    Works included Construction of chain link fence (904m and 1.5m high), Four chicken houses (65 x 10m), Ablution, Disinfectant Slab, Mortality Pit, Walkways (215m long and 1.5m wide), Main Kitchen (4.5 x7.0m) Access Gravel Road 750m long and 3.5m wide to site and Installation of Power line, Waterline and Tank Stand and Drilling of Borehole.

More Info

  • Commercial Laying of Farm Masindi Port, Rwenkunye : Construction of the Water lines in the Farm, Masindi Port Kiryandongo District

    Excavation works , laying of water pipes and general mechanical installation in chicken houses and other facilities

  • Proposed Extension of Hatchery at Seeta

    Works include Construction of Basement & Retaining Wall, Ground Floor and Construction of New Roof Structure on the Ground Floor.

  • Construction of Feed Mill, Egg Room and Manager’s House at Rwenkunyu Masindi Port, Masindi Port Kiryandongo District

    Raising and Setting up Stanchions (Steel Column) for Feed Mill, Painting Works of the Feed Mill in progress , Site clearing around the finished Feed Mill using a Motor Grader, Fixing of roof trusses on Manager’s House, Finishing Works being done on Manager’s House (nearly to completion), Raising and fixing of timber roof Trusses on Egg Room House in order to receive iron sheets in progress